
600kW – Wales
This installation covered the complete M&E build-out including pile installation, racking & module assembly, DC stringing, AC terminations, trenching and cable containment, and full earthing and lightning protection. Testing, commissioning, and certification. We concluded it with a handover package with as-built documentation and QA/QC record.



